Critical path · 9 threads · 246 linked records · 125 still blocking

The shortest honest route
from NO-GO to live.

Four registers describe the same handful of unmet prerequisites in four vocabularies. This page folds them into the units of work that actually exist, schedules them by their real dependencies, and recomputes the board verdict as you close them. Toggle a thread to see what it buys — the resulting state lives in the URL, so a plan can be shared exactly as you left it.

Verdict

NO-GO

Span if parallelized

13 d

Serial total

36 d

Open P0

7 / 7

7 prerequisites required before live operation are still open.

0 closed in this view

Dependencies, not a wish list.

A thread starts the day its prerequisites finish. The restore drill cannot precede audit immutability; the handoff exercise cannot precede the drill. The highlighted chain is the one that sets the span — shortening anything else changes nothing.

024681012T-1Second factor on every in…3d · P0T-2Malware scanning and quar…5d · P0T-3Database-level audit immu…4d · P0T-4Rehearsed destructive res…6d · P0T-5Durable scheduling and fr…5d · P0T-6Server-side tenant and or…4d · P0T-7Authority boundary proven…4d · P0T-8Second operator able to r…3dT-9Trial claims earned from …2d

Nine threads, 246 records.

Each thread lists the records it owns, drawn live from the evidence index. Every one links back to the register that renders it — nothing here is a summary that can drift.

T-1Security · 3 dP0

Second factor on every internal login

Can a stolen password alone reach production data?

Until MFA is enforced, one credential leak is a full-tenant compromise and no other control compensates.

Day 0–3 · starts now
T-2Security · 5 dP0

Malware scanning and quarantine before trust

Is an uploaded lender document scanned before anything reads it?

An unscanned document is processed by twelve automated roles; a hostile file reaches every downstream consumer at once.

Day 0–5 · starts now
T-4Operations · 6 dP0Critical chain

Rehearsed destructive restore

Has a replacement environment ever been restored and reconciled?

Backups that have never been restored are an assumption. RTO and RPO are unknown numbers until the drill is executed.

Day 4–10 · after T-3
T-6Engineering · 4 dP0

Server-side tenant and organization isolation

Is isolation enforced below the UI on every path?

UI filtering is not a boundary. One missed server-side check crosses lenders, which ends the trial outright.

Day 0–4 · starts now
T-7AI governance · 4 dP0

Authority boundary proven under adversarial load

Does the system refuse, rather than merely log, a prohibited AI action?

Confidence must never create authority. Refusal has to be demonstrated per prohibited action, not asserted once.

Day 4–8 · after T-6
T-9Measurement · 2 dRisk-acceptable

Trial claims earned from trial data

Is any published number derived from synthetic fixtures?

Efficiency claims measured in the same session that produced them are not evidence; separation must be visible.

Day 0–2 · starts now

Derivation

Threads are matched against the unified evidence index by vocabulary, not maintained by hand: 0 records across every register are attached automatically, of which 0 carry a blocking status. The verdict rule is the readiness package's own — an unverified control is not a passing control, so a single open P0 holds the whole board at NO-GO.